State DOT SCDOT Active

Bid / Bidding / RFP Preparation

Prepare, validate and review your DOT bid package. Select a state DOT to activate all modules.

Active bids
2
in preparation
Documents analyzed
3
IFBs & RFPs processed
Bid projects
in your workspace
SCDOT history
27
contracts for benchmarking
Recommended
🧭
Option A · Guided

Use the Readiness Wizard

6-step guided flow: Discover → Eligibility → Critical Inputs → Smart Agent Selection → Run Pipeline → Readiness Dashboard. Best for your first bid on the platform. ~20 minutes.

Start Wizard
Power user
Option B · Direct

Create a New Bid Project

Skip the wizard and jump straight to the 16-section intake form (273 fields). Best when you already know the platform and want to enter data directly, or when re-bidding a similar project. ~5 minutes setup.

New Bid Project

📂 My Bid Projects

— loading —
Active project for agents: + New Bid Project
Loading your bid projects…
🎼
13-Agent AI System · Live

AI-Powered Bid Pipeline — 12 Specialists + Master Orchestrator + RFI Drafting

Anthropic Claude reads your bid docs and produces structured agent outputs end-to-end. The 4 legacy modules below are kept for reference.

Module 1
IFB / RFP Analyzer
Step 1 Ready to analyze

Upload the IFB, RFP or project plans PDF. The AI extracts all pay items, spec sections referenced, special provisions, required submittals, bonding/insurance requirements and bid dates.

Drag & drop your IFB / RFP PDF here
or click to browse — PDF, DOC, DOCX accepted
Upload a document first to analyze
Project Information
Contract #C-2025-0847
Letting DateJune 18, 2025
DOT DistrictDistrict 3 — Greenville
Project DescriptionI-85 NB Resurfacing — Exits 44–51
Est. Contract Value$4,200,000
Project Length7.2 miles
Pay Items
Item #DescriptionUnitApprox Qty
P-0401-1Asphalt Surface Course (S9.5B)TON8,400
P-0401-2Asphalt Intermediate Course (I19.0B)TON6,200
P-0620-1Milling Existing Asphalt Pavement (2")SY44,000
P-0620-4Tack CoatGAL5,500
P-0607-1Traffic Control — Temporary SignsLS1
P-0812-1Pavement Markings — ThermoplasticLF38,000
Spec Sections Referenced
Div 400 — Asphalt Div 600 — Traffic Ctrl Div 800 — Incidental §401.4 — JMF §620.3 — Milling §660.3 — Markings SC-M-402 SC-M-407 SC-T-62 SC-T-75 SC-T-80 SC-T-97
Special Provisions Flagged (3)
SP-401-A: Restricted paving hours — no work between 10 PM – 6 AM on mainline I-85.
SP-200-B: Proof roll required at all milled surfaces before paving resumes.
SP-100-C: DBE goal of 8% applies — documentation due at bid opening.
Required Submittals
1. Asphalt JMF for each mix type (§401.4) — due 14 days before first paving
2. QC Testing Plan per SC-T-97 — due at preconstruction meeting
3. Traffic Control Plan (TCP) — due 7 days before lane closure
4. Milling machine inspection certification — due prior to milling operations
5. DBE utilization plan — due at bid submission
Bonding & Insurance Requirements
Bid Bond5% of total bid amount
Performance Bond100% of contract amount
Payment Bond100% of contract amount
Liability Insurance$1M per occurrence / $2M aggregate
Workers' CompPer statutory limits (SC)
Auto Insurance$1M combined single limit
Module 2
Bid Checklist Generator
Step 2 Ready

Auto-generate a complete bid preparation checklist based on project type and work categories. Every item cross-checked against SCDOT requirements.

Bid AI Specialists

12 specialized agents + 1 master orchestrator covering every stage of the procurement workflow — from document intake to final go / no-go validation.

12 Specialists + 1 Orchestrator + 1 Satellite
🎼
MASTER COORDINATOR ACTIVE claude-opus-4-5

Bid Orchestrator

The master agent that runs the complete 7-step bid workflow across all 12 specialists. Enforces non-negotiable guardrails: no unvalidated claims, no PASS without evidence, no submission with open Fatal risks. Delivers one executive report with Go / No-Go decision.

1. Intake 2. Classify 3. Parallel Analysis 4. Risk Review 5. Writing 6. Final Audit 7. Decision
Runs all 12 agents in ~30 seconds (simulation) · Real run uses Anthropic API